Skip to content

The Marketing Operating System · $97

Make marketing a team-run operation.

Install ownership, production gates, quality control, distribution, video standards, and a 90-day operating rhythm.

Operations Scorecard

Marketing Operating System scorecard showing eight team content operations dimensions and evidence fields

Prompt 6 of 14

Station Audit

8

maturity dimensions

40

score-based actions

7

production stations

13

installation weeks

14-day fit guarantee. One-time payment. Immediate access.

Secure Stripe checkout. No subscription.

Portable across file-capable AI assistants

Claude
ChatGPT
Gemini

See exactly what ships

Install the operation, not more activity

The scorecard finds the constraint. The seven stations define the work. The decision test filters automation. The standards and 90-day sequence make the system transferable to the team.

Team Content Operations Scorecard

Eight maturity dimensions, five evidence-based levels, and 40 prescribed actions

Marketing Operating System scorecard showing eight team content operations dimensions and evidence fields

Prompt 6 of 14

Station Audit

Review the content record against the seven stations. Identify the current station, owner, required input, exit gate, and missing evidence. Return it to the earliest station that has not passed.

Marketing OS modules

  • 02-team-content-operations-scorecard.md
  • 03-seven-station-content-operating-system.md
  • 04-automation-decision-test.md
  • 05-video-standards-pack.md
  • 06-90-day-install-sequence.md
  • 07-marketing-os-prompts.md

Install the complete operating system

Immediate access to all three cumulative rungs and the 90-day Start Here path.

The first useful run

Your first operating week

01

Score the real operation

Use evidence from the last 30 days across all eight dimensions. Select one constraint instead of fixing everything at once.

02

Run all seven stations

Move one real source piece from research to a verified result with owners and exit gates at every handoff.

03

Record the bottleneck

Measure cycle time and approval time, capture repeated corrections, and change the next installation week from evidence.

Use the tool you know

Choose your setup

Pick one path. Each setup uses the same operating files and includes a first-run check so you can confirm the context is installed.

Official Claude documentation showing how to start a Cowork session

Claude Cowork

Recommended

About 5 minutes

The simplest folder-based workflow

Give Cowork access to the product folders and add the included workspace instructions.

Official setup documentation shown above

Official Claude documentation showing project setup and project knowledge

Claude Projects

About 10 minutes

A reusable browser workspace

Upload the operating files, then paste the included project instructions.

Official setup documentation shown above

Official OpenAI documentation showing the Codex command-line interface

Codex

About 10 minutes

File-based work that benefits from visible changes

Open the product folders with the included AGENTS.md file, then begin with the read-only setup audit.

Official setup documentation shown above

The honest objection

Why not copy an SOP library?

Documents do not create an operation by themselves. This system ties maturity evidence to a prescribed action, then connects research, briefing, production, approval, distribution, and measurement through named gates.

Buy it if the team needs one installable path and a transfer test. Skip it if nobody will own the records, approvals, and weekly review.

Who it helps

  • Established real estate teams ready to assign marketing owners and approval windows
  • Content teams that need one traceable path from source to measured result
  • Operators who want to automate only after the manual path is stable

Who should skip it

  • Teams looking for a done-for-you implementation
  • Teams without a named operating owner or final approver
  • Anyone expecting a document library to replace weekly operating discipline

Before checkout

Questions before you buy

Why not just ask Claude to build this?
You can ask for an SOP. What you are buying is the cumulative operating model: eight evidence-based maturity ladders, 40 matched actions, seven production stations, an automation filter, two video paths, a 13-week install, and the earlier product foundations.
Does this include the first two products?
Yes. The Marketing Operating System is the cumulative third rung. Its delivery folder includes the Chief of Staff and Demand Engine materials beside the Marketing OS modules.
Do we need a separate project-management tool?
No specific platform is required. Use the team’s existing system of record as long as it can show the current station, owner, due date, approval, evidence, and final link.
Does the system publish automatically?
No. The operating instructions require explicit approval before public, paid, regulated, destructive, or irreversible actions. Automation candidates are scored before any build is recommended.
How is the product delivered?
After Stripe confirms payment, the receipt and verified thank-you page provide the public read-only Drive folder and Start Here guide.
How does the 14-day guarantee work?
Use the system with one real content workflow. If it is not a fit, reply to your receipt within 14 calendar days of purchase for a full refund.

Immediate access after payment

Run marketing without carrying it all in one head

Score the baseline, name the owners, and move one real piece through the complete operation before increasing volume.

14-day fit guarantee. One-time payment. Immediate access.

Want the system installed for your team?